Creating certainty before execution begins.

Analysis and perspectives from Primesel Group principals and senior operators, informed by first-hand experience delivering industrial megaprojects across advanced manufacturing, energy, data centre and semiconductor sectors.

Featured insight

Hard hat and drawings on a table as a project team in hi-vis meets in the background

Construction Productivity8 min read

The Subcontractor Economy: Redesigning Delivery for a Networked Construction Market

Subcontracting is no longer a sourcing choice at the edge of the project - it is the production system through which much of European construction is delivered. The leadership question is whether the project management system can see, assure and coordinate the organisations on which the schedule actually depends.

Richard Casey

All perspectives

4 insights shown

The Subcontractor Economy: Redesigning Delivery for a Networked Construction Market

Construction Productivity8 min read

The Subcontractor Economy: Redesigning Delivery for a Networked Construction Market

Subcontracting is no longer a sourcing choice at the edge of the project - it is the production system through which much of European construction is delivered. The leadership question is whether the project management system can see, assure and coordinate the organisations on which the schedule actually depends.

Richard Casey

The Infrastructure Race Behind the Advanced Technology Boom

Infrastructure & Energy9 min read

The Infrastructure Race Behind the Advanced Technology Boom

As investment in semiconductors, artificial intelligence and advanced manufacturing accelerates, the ability to build the factory or data centre is only part of the challenge. Increasingly, the decisive question is whether the infrastructure ecosystem around it can keep pace.

Richard Casey

Labour Productivity: The Hidden Constraint on Major Capital Projects

Labour Productivity7 min read

Labour Productivity: The Hidden Constraint on Major Capital Projects

Construction labour productivity grew at 0.4% CAGR from 2000 to 2022 - against 3.0% in manufacturing. For semiconductor fabs, data centres, and energy infrastructure, the labour gap is no longer a HR problem. It is the binding constraint on delivery.

Richard Casey

Engage Primesel Group

Discuss these ideas with us.

Our principals are always open to a confidential conversation about the readiness questions facing your programme.